Highway drawing approval letter 1:

Submission of Traffic Signage Plan for Project Highway from km. 0+000 to km. 60+000BHS—Reg.

Here is the draft of the traffic signage plan submitted by the concessionaire. To the IE for review, approval, and adoption of the highway construction works.

Highway drawings approval letter

To

The Authority/IE/AE/PMC,

Subject: Submitting the Traffic Signage Plan for the Project Highway from km. 0+000 to km. 60+000BHS—Reg

Dear sir,

With reference to the above subject, we are herewith submitting the signage plan as per IRC 67-2022 for the project highway for your review and approval.

Si.no
Drawing description
Drawing no.
From
To
Revision
Date
1
Signage plan
Road signage plan/0-1/2023
0+000
1+000
R0
Jan 2024
2
Road signage plan/1-2/2023
1+000
2+000
R0
Jan 2024
3
Road signage plan for 2/3/2023
2+000
3+000
R0
Jan 2024
4
Road signage plan 3-4/2023
3+000
4+000
R0
Jan 2024

[Yours Sincerely,]

[Insert the name of the authorized person].

***************************************************************************************************************************************************************************************************************************************

Highway drawing approval letter 2:

Review and approval of the highway signage schedule for the project highway from km. 0+000 to km. 60+000 BHS-Reg.

Here is a sample draft letter format that the Independent Engineer uses to review and approve the highway signage plan or schedule. On the submission of the concessionaire to adopt for the highway construction works

To

The Concessionaire,

[Subject]: Review and approval of the highway signage schedule for Project Highway, spanning from km 0+000 to km 60+000BHS—Reg.

Dear sir

This pertains to the subject matter previously mentioned. We reviewed the Concessionaire’s signage plan for the project highway from km. 0+000 to km. 60+000 BHS, adhering to the IRC 67 Code of Practice for road signs and other relevant IRC codes.

The concessionaire’s representative and an independent engineer jointly inspected the site. We have evaluated the signage requirements on the project highway, ranging from km. 0+000 to km. 60.000 BHS, taking into account the current site safety standards to satisfy the needs of the road users.

Consequently, Annexure-A contains the final traffic signage list for the project highway. The same has to be followed on site for the implementation of traffic signage.

“It is important to note that this list is not exhaustive and is subject to changes according to upcoming project site requirements during the operation and maintenance phases.”

Thanking you while ensuring you our best services.

[Yours,]

[Insert the name of the authorized person].

****************************************************************************************************************************************************************************************************************************************

Highway drawing approval letter 3:

Submission of road marking plan for project Highway from km. 0+000 to km. 60+000BHS—Reg.

The following is a sample draft letter format for a road marking plan. It was submitted by the concessionaire to IE for review, approval, and adoption on the highway.

To

The Authority/IE/AE/PMC,

Subject: Submission of Road Marking Plan for Project Highway from km. 0+000 to km. 60+000BHS—Reg.

Dear sir,

With reference to the above subject, we are herewith submitting the road marking plan for the carriageway. Also, a separate drawing showing the details of road marking for junctions and bridge approaches as per IRC 35 (2015) Code of Practice for road markings for the project highway is for your review and approval.

Si.no Drawing description Drawing no. From to Revision Date
1 Road marking plan Road marking plan/0-1/2023 0+000 1+000 R0 Jan 2024
2 Road marking plan/1-2/2023 1+000 2+000 R0 Jan 2024
3 Road marking plan for 2/3/2023 2+000 3+000 R0 Jan 2024
4 Road marking plan: 3-4/2023 3+000 4+000 R0 Jan 2024

[Yours,]

[Insert the name of the authorized person].

****************************************************************************************************************************************************************************************************************************************

Highway drawing approval letter 4:

Review and approval of the road marking plan for the project Highway

This is a sample draft letter of the Independent Engineer’s review and approval of the highway road marking plan.

To

The Concessionaire,

Subject: Review and approval of the highway road marking plan for Project Highway, spanning from km 0+000 to km 60+000BHS—Reg.

Please refer to the submission described in the reference above. The submission pertains to the road markings for the project highway section, which spans from km. 0+000 to km. 60+000, and includes both junctions and bridge approaches. The submission was looked into and found to be in order according to the IRC 35 Code of Practice for road markings.

Project Highway is receiving the construction materials for implementation.

The requirements in the above documents are not exhaustive and may be modeled or remodeled with additions as the requirements evolve further.

The as-built workouts shall be marked for independent engineers and authorities, as per agreement requirements.

[Yours Sincerely,]

[Insert the name of the authorized person].

Highway drawing approval letter 5:

Submission of Road Studs Details for Project Highway from km. 0+000 to km. 60+000BHS—Reg.

The following is a sample draft letter format for road stud details. It was submitted by the concessionaire to IE for review, approval, and adoption on the highway.

To

The Authority/IE/AE/PMC,

Subject: Submission of road stud detail for Project Highway from km. 0+000 to km. 60+000BHS—Reg.

Dear sir,

With reference to the above subject, we are herewith submitting the road studs (cat eyes) details for Project Highway from km. 0+000 to km. 60+000BHS for your review.

[Yours,]

[Insert the name of the authorized person].

****************************************************************************************************************************************************************************************************************************************

Highway drawing approval letter 6:

Submission of Road Studs Details for the project highway. IE’s review and comments

It is a sample draft letter of the Independent Engineer’s review and comments on the Submission of Road Stud Details.

To

The Concessionaire,

Subject: Submission of Road Studs Details for Project Highway from km 0+000 to km 60+000BHS Review and comments by IE—Reg.

Dear Sir,

Please refer to the submission as stated in the above reference, pertaining to reflective pavement markers (road studs) for the project highway section, i.e., from km. 0+000 to km. 60+000, including junctions reviewed and found to conform to and according to the warrants of IRC SP 84 and IRC 35.

Though the requirements for reflective pavement markers are timely to date, This present-day requirement is augmented with future-day advancements accordingly.

Thanking you and ensuring our best services at all times.

[Yours,]

[Insert the name of the authorized person].

Also Read procedure for borrow area approval

You can find various sample draft formats for highway operation and maintenance.

Additionally, you can find various sample draft formats for highway construction.

Highway drawing approval letters: FAQs

Team Highway correspondence will update soon

Leave a Comment