Status of Highway Project Facilities

Written by Team Highway Correspondence

Updated on:

Status of Highway Project Facilities

The CA sets specific requirements for the highway project facilities. Under the provisions of CA, the concessionaire shall construct the project facilities. Such facilities shall include:

  1. Toll plaza
  2. Roadside furniture and roadside facilities
  3. Highway lighting;
  4. Pedestrian and cattle pass facilities;
  5. Landscaping and tree plantations;
  6. Rest areas;
  7. Truck lay-byes;
  8. Bus bays, pickup bus stops, and bus shelters;
  9. Cattie crossings;
  10. Development of a site for wayside amenities;
  11. Traffic aid posts;
  12. Medical aid posts;
  13. Vehicle rescue posts;
  14. Telecom system; and
  15. Highway traffic management system.
  • These facilities comprise four or six-lane sections of the project highway. These facilities should be completed by or before the project’s scheduled completion date.
  • The concessionaire must care for these facilities in a manner consistent with good industry practices, according to the concessionaire’s O&M obligations.
  • Also, the concessionaire shall maintain the project highway, project facilities, and project assets in working and orderly condition at all times during the concession period or any extension thereof.
  • Maintenance of road furniture and highway facilities shall include attending to repairs to various parts of the road furniture and connected services as and when necessary. Replace any irreparable work items within a reasonable timeframe.
  • The highway authority will receive all road furniture and facilities that are usable and in working order at the conclusion of the concession period or its extension.
  • During the operation period, the concessionaire shall promptly provide any relevant information about the project highway that an independent engineer may require.

Status of Highway Project Facilities Letter 1:

Updating the Status of the Highway Project Facilities

Status of Highway Project Facilities: During the operation and maintenance period, the contractor is required to update the status of the highway project facilities on a monthly basis. This is to facilitate the review and smooth monitoring of the project highway, thereby enhancing road user safety and maintaining the project highway’s service level.

Status of Highway Project Facilities

To

The Concessionaire,

Subject: Updating the status of the project Facilities-Reg…

Dear Sir,

Regarding the previously mentioned topic, we are providing you with a format that details the current state of the project facilities in the project corridor. You should routinely submit the information in your monthly Operation and Maintenance Report, following a joint site inspection with the team’s independent engineer.

Thank you for ensuring our best services.

[Yours Sincerely,]

[Insert the name of the authorised person].

Sample format to furnish the status of the Highway project facilities

This is a sample format to provide information about the status of the highway project facilities.

Status of Highway Project Facilities in the Project Corridor during the month of January 2024
Sr. No. Description of Project Asset Unit Inspection Findings
As per Inventory / CA Available at site Missing Remarks of Independent Engineer
A Pavement of the Carriageway:
1 Pot Holes Nos.
2 Cracks Sqm.
3 Rutting
(a) Length or width Sqm.
(b) Depth MM
4 Other defects: ravelling, shoving, slipage, etc.
Ravelling Sqm.
Shoving Sqm.
Slipage
5 Kerb line, Central line, edge line marking Sqm.
(a) Missing Sqm.
(b) Faded
6 Studs or cat eyes in carriageway are missing Nos.
7 Rumble Strips Nos.
(a) Painting Sqm.
(b) Studs missing Nos.
8 Performance criteria (BBD and BI Test) Km.
BI Km.
BBD Km.
B Condition of Earthen Shoulder
1 Depression/Settlement/Rain cuts Cum.
2 Improper cross-slopes Cum.
3 Raised shoulders Cum.
C Central Median
1 Broken Median Kerb Rmt.
2 The faded color of median wall Sqm.
3 Rank vegetation Sqm.
4 Median drains are functioning Sqm.
5 Median Plantation (Nos.) Nos.
(a) Gap in plantation Sqm.
(b) improper trimming/pruning of plantation Nos.
D Seperator island
1 Broken separator wall Mtr
2 Painting (Fade) on Guard rails
3 Functioning of cross-drain
4 Proper cleaning of dirt along side wall
5 PCC on separator
E Islands
1 Broken Wall
2 Top level of Island
3 Cleaning of Island
4 Guard rails of Island
(a) Painting
(b) Broken or tilted
D Traffic safety and control devices:
1 Crash Barrier Rmt.
(a) Missing Rmt.
(b) Tilted Rmt.
(c) Broken Rmt.
2 Steel Guard Rails Rmt.
(a) Missing Rmt.
(b) Tilted Rmt.
(c) Broken Rmt.
(d) Faded Rmt.
3 Traffic Signs and Gantries
(i) Directional Signs Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Broken Nos.
(d) Faded Nos.
(e) Posters on signages Nos.
(ii) Cautionary Signs Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Broken Nos.
(d) Faded Nos.
(e) Posters on signages Nos.
(iii) Mandatory Signs Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Broken Nos.
(d) Faded Nos.
(e) Posters on signages Nos.
(iv) Chevron Sign Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Broken Nos.
(d) Faded Nos.
(e) Posters on signages Nos.
(v) Hazard Marker or Bollard Sign Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Broken Nos.
(d) Faded Nos.
(e) Posters on signages Nos.
(vi) Other Delinators Nos.
(viii) Retro reflective tape below W-beam, any object in 1.5 m of c/w Nos.
4 Road Marking Central/Edge line (Sqm.) Nos.
4 Other Road Furniture Nos.
(i) Kilometer stones Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Faded Nos.
(d) Posters on signages Nos.
(ii) Hectometer Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Faded Nos.
(d) Posters on signages Nos.
(iii) ROW pillars Nos.
(a) Missing Nos.
(b) Tilted Nos.
(c) Faded Nos.
(d) Posters on signages Nos.
E Service Road:-
1 Potholes Nos.
2 Debris Sqm.
3 Entry/Exit point
4 Other defects in service road
F Footpath/Drain Cover
1 drain cover broken Nos.
2 Functioning of Inlet Sqm.
3 side wall broken Cum.
4 Silting of drains Sqm.
5 Water pool visible within ROW Sqm.
6 Drainage of service road Sqm.
G Housekeeping of Area with ROW:
1 Cleaning of ROW Sqm.
2 Removal of Debris Sqm.
3 Encroachment of ROW Sqm.
4 unauthorized hoardings within ROW Nos.
H Structures
1 Painting of Head Wall Sqm.
2 Numbering of Structure Nos.
3 Settlement of Approach road Sqm.
4 Handrails missing, Faded Sqm.
5 Functioning of Spouts Nos.
6 Wearing coat or footpath damaged Sqm.
7 Condition of Expansion Joint Sqm.
8 floor of structure or bed damaged Sqm.
9 Silting at bed level Sqm.
10 Pitching of embankment Sqm.
11 Chute drain damaged Sqm.
12 Rank vegetation in Retaining/RE wall Sqm.
13 Slope of embankment damaged Sqm.
14 Cracking in pier, abutment, slabs, return wall, or dirt wall Sqm.
15 Scouring around pier and abutment Sqm.
I Bus Shelter and Truck Laybyes:
1 Roof shade and side walls in damaged condition Sqm.
2 Seating arrangement (Kota Stone): missing or broken Sqm.
3 Debris in circulation areas Sqm.
4 Potholes in circulation areas Sqm.
5 Village name board on bus bays Nos.
6 Toilets cleaning, water supply, tube light fittings Nos.
7 Damaged taps, leaking  from taps Nos.
8 Damaged blocks in truck lay-byes Nos.
9 Drinking water facilities Nos.
J Lighting
1 High mast light Nos.
(a) Missing Nos.
(b) Not working Nos.
(c ) Faded pole Nos.
(d) posters on pole Nos.
K Toll Plaza
1 Details of Grivance Register
2 Response time of Accident
3 Functioning of Ambulance, Tow-away Trucks and Cranes
4 Functioning of PTZ camera Nos.
5 Functioning of Registration plate camera Nos.
6 Toll booms functioning Nos.
7 Validation with ATCC
8 Surprising check of toll operations (once a week) Nos.
9 Visibility of signages on toll plaza Nos.
L Avenue Plantation
1 Total Scope Nos.
2 No. of Plants more than one year Nos.
3 No. of Plants Planted this Year Nos.
(a) Protection Nos.
(b) Watering Nos.
(c ) Manuring Nos.
(d) Mowing, rounding Nos.
M Median Plantation
1 Total Scope Nos.
2 Missing plants Nos.
3 Pruning
4 Watering
5 Cleaning of rank vegitation
6 Other horticultural operations like Manuring, rounding, etc.

Status of Highway Project Facilities: A note to the visitor

The above-stipulated list and instructions for updating the status of project facilities on the project highway are not hard-and-fast rules. It is purely in the engineer’s interest to closely monitor the project highway facilities at his discretion.

Also read NSV Report Letter: Request for program, submission, Review observations and comments

You can find various sample draft formats for highway operation and maintenance correspondence

Status of Highway Project Facilities: FAQs

The team highway correspondence will update shortly.