NSV Report letter

Written by Team Highway Correspondence

Updated on:

NSV Report Letter

About the NSV Report Letter: 

The following letters discuss NSV’s pavement roughness measurement. This includes the contents of subsequent letters.

  • Request for conducting bi-annual roughness measurements The measurements can be conducted using a bump integrator, a rough meter, or any other approved, appropriate method.
  • Intimation about the planning and conduct of the roughness survey using a NSV.
  • The process involves submitting the IRI and BI values using the Network Survey Vehicle (NSV).
  • Review, observations, and comments of the IE on the submission.

Letter1: Proposal for conducting a roughness measurement test on the highway. The request is to conduct a roughness measurement test on the highway bi-annually, in accordance with the provisions of CA-Reg.

The following is a sample draft letter format related to the subject matter. used to inform the concessionaire about conducting the BI-Annual roughness measurement. And the test was carried out using appropriate, approved methods and equipment. Such as a bump integrator, rough meter, or the appropriate method of any other.

To

The Concessionaire,

Subject: Conduct a bi-annual roughness measurement test on the project highway—Reg

Dear sir,

With reference to the subject, it is to inform you that 

According to Clause 5.8 of the Manual of Specifications and Standards for Four Laning of Highways (IRC:SP:84), the pavement’s performance evolves over time. And, as scheduled in the concession agreement’s Schedule K, The procedures outlined in the maintenance manual and annual maintenance program are applicable.

The roughness measurement must be carried out using appropriate, approved methods. The matter has been pending for a month.

Therefore, we instruct you to conduct the roughness measurement test immediately.

Please treat this as urgent. 

Thank you while ensuring our best services.

[Yours,]

[Insert the name of the authorized person].


****************************************************************************************************************************************************************************************************************************************

Letter 2: Provides information about the planning and execution of a roughness survey using a Network Survey Vehicle.

The following is a sample draft letter format to inform the authority, or IE. This letter pertains to the planning and execution of the roughness measurement process. Instead of a bump integrator and rough meter, the equipment uses an NSV.

NSV Report letter

Image of a network survey vehicle.

To

The Authority/IE/AE/PMC,

Subject: Planning and conducting a roughness survey using a Network Survey Vehicle—Reg.

Dear sir,

Apropos to the subject and the reference cited above. It is to inform you that we plan to use a Network Survey Vehicle (NSV) to conduct the roughness survey. on September XX, 2024.

The NSV is a special-purpose vehicle. That includes a digital laser profiler (DLP) for measuring pavement roughness. The ASTM E 950 Class-1 laser profilometer is a high-speed road roughness measuring system. It has more accurate roughness measurements. India has adopted the laser profilometer system as standard practice. Following its extensive use worldwide.

We would also like to draw your attention to Circular No. 11041/218/2007-Admn. This circular, dated November 3, 2009, Permits the use of laser profilometers for roughness measurement instead of bump integrators.

[Yours,]

****************************************************************************************************************************************************************************************************************************************

Letter 3: Submission of Network Survey Vehicle (NSV) Survey Report-Reg.

The following is a sample draft cover letter format for submitting the NSV Report. To the independent engineer or highway authority.

To

The Authority/IE/AE/PMC,

Subject: Submission of NSV Report-Reg

Dear sir,

With reference to the above subject and references (1) and (2) above cited, We are now submitting the IRI and BI values using the Network Survey Vehicle (NSV).

[Yours,]

[Insert the name of the authorized person].

****************************************************************************************************************************************************************************************************************************************

Letter 4:Review observations and comments on the NSV Report Submission.

The following is a sample draft letter of review observations and comments on the NSV report submitted by the concessionaire. 

To

The Concessionaire,

Subject: Review Observations and Comments on the Submission of the NSV Report-Reg

Dear sir,

This concerns the submission of the NSV report. It is time that we review the submitted NSV report. The following are the observations on the same

About the submission of the network survey vehicle report

  • Lack of clarity in the submission of the network survey vehicle report
  • We checked accuracy at various points along the survey route.
  • All parameters were translated from field observations into measurable quantities.The NSV report links the correlation patterns of implemented devices to the output.

Review of Observations and Comments on the NSV Report Submission

  1. The NSV report document is enumerated. 
  2. The workflow sequence is exclusive to the quality assurance program.
  3. The NSV Report submission is concerned with the transference of the following All of the parameters captured from ground observations.
  4. The report fails to take into account the correlations and considerations between these parameters. 
  5. They influence the derivation of IR values, both individually and in combination.
  6. The NSV Report submission remains silent about the derivation of the customization factor, which transforms IR into a roughness index.
  7. The same thing must be elaborated on by mentioning the influence of ground parameters. 
  8. Each parameter’s deduction is outlined in detail. quantified contribution of the conversion factor’s arrival.
  9. The essence and relevance of the applicable quantification weights depend on the contributions of all relevant parameters.
  10. To arrive at the conversion factor, we will need to elaborate. We should use the customized factor, not the available one. The calculations for roughness arrival will use the conditions and terms provided.

Conclusion 

The NSV Report submission must present all the lengths with comprehensive chainages that rectification can answer. This applies to all lane kilometers where the roughness index exceeds 2750 mm/KM. To tabulate the cumulative length, lane-wise. Also, present the remarks column in the NSV report. And detailing the carriageway’s condition during the test. 

Additionally, the report should highlight the following conditions: That is, it causes distress and contributes to the overshoot of the roughness index at specific locations. 

[Yours,]

[Insert the name of the authorized person].

****************************************************************************************************************************************************************************************************************************************

Also read about Notice on Highway surface defects

You can find various sample draft formats for highway operation and maintenance correspondence.

FAQs Related to the NSV Report letter

What’s the NSV Report?

It is the report of an equipment-based inspection of the project highway. By using a network survey vehicle, check all the physical parameters of the highway. 

How do I check the pavement performance evaluation?

The performance of the pavement evaluation depends on both the physical and structural conditions of the pavement. The raiding quality parameters are measured with a bump integrator and profileo meters. The structural conditions of the pavement are measured with the Beklemen beam deflection test.

Can we use laser profilometers to measure roughness instead of bump integrators?

Yes, as per the ASTM E 950 Class-1 laser profilometer, which is a high-speed road roughness measuring system. It has more accurate roughness measurements. India has adopted the laser profilometer system as standard practice. Following its extensive use worldwide.

For the purpose of measuring roughness, laser profilometer circulars are acceptable.

Circular No. 11041/218/2007-Admin, dated November 3, 2009. This circular also permits the use of laser profilometers for roughness measurement instead of bump integrators.

What is the frequency of roughness measurement on the project highway?

It is subject to the provisions of the concession agreement for a specific project highway. If CA is silent, at that time we can adopt the IRC:SP:84 guideline, as per Section 5.8 of the of the pavement evaluation of highways.

 

Leave a Comment